YOPACKAGE Start a dieline
Process

Six steps,
in this order

Packaging goes wrong in predictable places: a dimension taken from a drawing instead of the product, a colour approved on a screen, a run committed to without a sample. The sequence below exists to close those gaps.

01
Day 1

Brief

We start from the product, not the box. Dimensions, weight, fragility, how it ships and where it lands.

You give us
  • Product photos or a sample
  • Rough quantity and budget
  • Any brand files you have
You get back
  • A structure recommendation
  • An indicative cost per unit
  • A realistic timeline
02
Days 2–4

Structure

A dieline drawn to your exact product, with the board specified for the journey it has to survive.

You give us
  • Confirmation of dimensions
  • Courier or retail requirements
You get back
  • Dieline in AI / PDF
  • Board and flute spec
  • 3D visual of the folded box
03
Days 4–7

Artwork

Your design applied to the dieline, or designed from scratch. Files built for the press, not for screen.

You give us
  • Logo and brand assets
  • Copy, barcodes, compliance marks
You get back
  • Print-ready artwork
  • Colour build in CMYK + spots
  • A visual proof to sign off
04
Days 7–10

Sample

A physical prototype before anything runs. This is where board weight and fit get argued out, cheaply.

You give us
  • Sign-off on the proof
  • A courier address
You get back
  • Physical sample box
  • Fit test with your product
  • One free revision round
05
Days 10–18

Production

Print, die-cut, finish, glue, assemble. Checked on the floor at press start and again before dispatch.

You give us
  • Final approval
  • Delivery address and dates
You get back
  • Full run produced
  • QC photos before dispatch
  • Delivery to your door
06
Ongoing

Reorder

Dielines, plates and specs stay on file. The second run is a message, not a project.

You give us
  • Quantity and date
You get back
  • Same spec, no re-setup
  • Shorter lead time
  • Volume pricing as you scale

Questions we get
before the first order

If yours isn't here, ask it directly — info@yopackage.com reaches a person, not a queue.

Most structures start at 250–500 units. Rigid and drawer boxes start at 250 because the tooling is the same whether you order 250 or 2,500. If you need fewer for a launch or a trade show, ask — short digital runs are sometimes possible at a higher unit cost.

No. If you have brand files we work to them; if you don't, we design the artwork and the structure together. Either way you receive the dieline and the print-ready files, and they are yours to keep.

Yes, and we insist on it. Every job includes a physical sample before production. Board behaves differently from a screen, and the sample is the cheapest place to change your mind.

Twelve to eighteen working days from approved artwork, depending on the finish. Foil and rigid construction add time; plain kraft mailers are the quickest. Reorders are faster because the setup is already done.

Most of what we run is recyclable in ordinary paper streams. We can spec recycled content, water-based inks, and drop lamination entirely where the structure allows it. We will tell you honestly when a finish makes a box harder to recycle.

Yes. Production is coordinated end to end and delivered to your address or your fulfilment centre. For repeat clients we can hold stock and release it in batches.

Start at step one

Tell us about the product and we'll take it from the brief through to the pallet.